Installing The Mx2020 Dc Cable Manager; Figure 152: Installing A Cb-Re - Juniper MX2020 Hardware Manual

3d universal edge router
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

Related
Documentation

Installing the MX2020 DC Cable Manager

Copyright © 2015, Juniper Networks, Inc.

Figure 152: Installing a CB-RE

0
Preventing Electrostatic Discharge Damage to an MX2020 Router on page 558
Effect of Taking the MX2020 Host Subsystem Offline on page 402
Taking an MX2020 Host Subsystem Offline on page 401
Removing an MX2020 CB-RE on page 419
NOTE:
To accommodate additional clearance, you may order an extended
DC cable manager from Juniper Networks.
To install the DC cable manager (see
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to one of the ESD points on the chassis.
Position the DC cable manager over the two slots located on both sides of the DC
2.
PDM.
Chapter 22: Installing and Replacing Components
19
Figure 153 on page
304):
303

Advertisement

Table of Contents
loading

Table of Contents