Juniper MX2020 Hardware Manual page 293

3d universal edge router
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

Related
Documentation
Copyright © 2015, Juniper Networks, Inc.
Verify that an external management device is connected to one of the Routing Engine
3.
ports on the CB-RE (
AUX
NOTE:
The management Ethernet port will not be functional until you
have completed the initial configuration.
Turn on the power to the external management device.
4.
Switch on the dedicated customer site circuit breakers to provide power to the AC
5.
power cables. Follow your site's procedures.
Verify that the LEDs on both PDM and PSM light green steadily.
6.
If any of the status LEDs indicates that the PDM is not functioning normally, repeat
the installation and cabling procedures.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
7.
the strap to one of the ESD points on the chassis.
Switch the power switch on one of the PSMs to the on (
8.
momentarily, then lights steadily.
NOTE:
After a PSM and PDM are powered on, it can take up to 60 seconds
for status indicators—such as the output status LEDs on the PSM, and the
command output on the craft interface—to indicate that the PSM and
PDM are functioning normally. Ignore error indicators that appear during
the first 60 seconds.
Verify that the
PWR OK
9.
PDM is correctly installed, functioning properly, and providing power to the AC outputs.
On the external management device connected to the Routing Engine, monitor the
10.
startup process to verify that the system has booted properly.
Verify the MX2020 router power up, system initialization, and status. See
11.
Configuring the MX2020 Router" on page
of the MX2020 Router Components" on page
MX2020 Three-Phase Delta AC Power Distribution Module Description on page 86
MX2020 Three-Phase Wye AC Power Distribution Module Description on page 88
Connecting the MX2020 Router to a Console or Auxiliary Device on page 276
Connecting AC Power to an MX2020 Router with Three-Phase Delta AC Power
Distribution Modules on page 249
Mapping Input Power from AC Power Distribution Modules to AC Power Supply Modules
on the MX2020 Router on page 168
Powering Off the AC-Powered MX2020 Router on page 527
Preventing Electrostatic Discharge Damage to an MX2020 Router on page 558
Chapter 19: Connecting the Router to Power
,
, or
).
CONSOLE
MGMT
LED on the AC PSM faceplate is lit steadily, indicating that
287, and
"Maintaining and Verifying the Status
340.
) position. The
led blinks
|
OK
"Initially
261