Preventive Maintenance - Oce variolink 9522 User Manual

Hide thumbs Also See for variolink 9522:
Table of Contents

Advertisement

6
6.3

Preventive Maintenance

After a set number of copies (500,000 copies) have been made on your ma-
chine, Preventive Maintenance (PM) will be required for maintaining optimal
performance.
When preventive maintenance is due, a message and the PM icon "
prompt you to contact your service representative for maintenance.
!
Detail
The administrator can call for service using the Utility setting. See POD
Administrator's Reference.
In this case, you don't have to make a call for preventive maintenance,
because your machine has been monitored automatically by your service
representative.
6-8
Maintenance
" will
VarioLink 9522

Advertisement

Table of Contents
loading

Table of Contents