Connect External Ducting; Install Rectifiers And Breakers - Christie D4KLH60 Mirage 4KLH Installation Manual

Laser projection system
Hide thumbs Also See for D4KLH60 Mirage 4KLH:
Table of Contents

Advertisement

Connect external ducting

This illustration shows the three recommended cooling configurations.
Front plenum installed with air intake and exhaust using heating, ventilation, and air
A
conditioning (HVAC) ducts. Any combination of the top and side ducts can be used.
Front plenum removed with air intake from room and exhaust using HVAC duct. Top or side
B
exhaust duct can be used.
Front plenum and rear door removed with free air flow. One meter of air space behind the laser
C
rack is required. No HVAC system is required.

Install rectifiers and breakers

A qualified electrician is required to install the single phase (200 - 240) VAC, 30 A, (50 - 60) Hz
power lines to the power distribution unit and the wall outlet for the laser system network switch.
See
Laser rack power requirements
1. At the wall circuit breaker, turn off the power to the laser rack.
2. Insert the rectifiers in the lower section of power distribution unit at the bottom of the laser
rack.
3. Turn the breakers to the off position and insert them in the upper section of the power
distribution unit.
Each laser module has one breaker.
4. Turn on the power to power distribution unit at the wall breaker.
D4KLH60/Mirage 4KLH Installation Guide
020-101374-01 Rev. 1 (05-2014)
on page 25.
Installation
29

Advertisement

Table of Contents
loading

Table of Contents