Connect External Ducting; Install Rectifiers And Breakers - Christie CP42LH Installation Manual

Hide thumbs Also See for CP42LH:
Table of Contents

Advertisement

Connect external ducting

This illustration shows the three recommended cooling configurations.
Front plenum installed with air intake and exhaust using heating, ventilation, and air
A
conditioning (HVAC) ducts. Any combination of the top and side ducts can be used.
Front plenum removed with air intake from room and exhaust using HVAC duct. Top or side
B
exhaust duct can be used.
Front plenum and rear door removed with free air flow. One meter of air space behind the laser
C
rack is required. No HVAC system is required.

Install rectifiers and breakers

A qualified electrician is required to install the single phase (200 - 240) VAC, 30 A, (50 - 60) Hz
power lines to the power distribution unit and the wall outlet for the laser system network switch.
See
LM Rack (Full/Half) power requirements
1. At the wall circuit breaker, turn off the power to the laser rack.
2. Insert the rectifiers in the lower section of power distribution unit at the bottom of the laser
rack.
3. Turn the breakers to the off position and insert them in the upper section of the power
distribution unit.
Each laser module has one breaker.
4. Turn on the power to power distribution unit at the wall breaker.
Do not turn on the breakers in the power distribution unit until after the laser modules are
installed.
5. Verify the rectifier and power distribution unit status lights are on.
CP42LH Installation Guide
020-101373-02 Rev. 1 (06-2015)
on page 28.
Installation
31

Advertisement

Table of Contents
loading

Table of Contents