Christie D4KLH60 Mirage 4KLH Installation Manual page 31

Laser projection system
Hide thumbs Also See for D4KLH60 Mirage 4KLH:
Table of Contents

Advertisement

2. Remove the panel and place it in the base of the laser rack.
The panels must be kept with the laser rack.
3. Continue removing adjacent panels until there is an open slot for each laser module.
Do not remove more panels than required because they ensure proper airflow throughout the
laser rack.
4. Lower the LOS covers for the same slots.
a. Loosen the two screws securing the LOS cover with a 3mm ball driver.
b. Slide the LOS cover down.
5. Keeping the laser module level, slide it out of the box.
6. Check the laser module for any possible damage that may have occurred during shipping.
Do not use a damaged laser module.
7. Slide the narrow end of the laser module into the lowest slot position of the laser rack.
Always add laser modules from the bottom up. Do not skip slots.
8. Secure the laser module to the laser rack with the four screws you removed in step 1.
9. Repeat steps 5 to 8 for the remaining laser modules.
D4KLH60/Mirage 4KLH Installation Guide
020-101374-01 Rev. 1 (05-2014)
Installation
31

Advertisement

Table of Contents
loading

Table of Contents