Table 5-8 Installing Three-Enclosure Subsystem Cables - Compaq StorageWorks DS-BA370 Series User Manual

Ultrascsi raid enclosure
Table of Contents

Advertisement

Table 5–8
Installing Three-Enclosure Subsystem
Cables
1.
Complete Table 5–5 to shut down the UltraSCSI subsystem.
2.
Use a screwdriver to loosen the two spring-loaded mounting screws
on the I/O module.
3.
Grasp the I/O module by
the cable support bracket
and pull it straight
outward until removed
from the enclosure
shroud.
4.
Repeat steps 2 and 3 for all the I/O modules within the three
enclosures.
5.
On the master enclosure
I/O module, align the
Cable A (C
ALLOUT
connector with the left
connector. Gently insert
the cable connector into
the module connector.
Tighten both cable
connector thumb screws
to fully seat the
connector.
6.
Install a wire tie through the holes on the cable support bracket and
around the cable. Tighten the wire tie.
Single-Ended I/O Module
A)
UltraSCSI RAID Enclosure 5–17
CXO5816A
A
CXO5854B

Advertisement

Table of Contents
loading

Table of Contents