Compaq StorageWorks DS-BA370 Series User Manual page 145

Ultrascsi raid enclosure
Table of Contents

Advertisement

Table 6–6
Installing an AC Input Box (Continued)
3.
Align the ac input box (C
lower left or lower right corner of the RAID enclosure, respectively.
1
2
3
4
4.
Push in on the ac input box to fully seat it.
5.
Tighten the two retaining screws (C
6.
Connect the ac power cord (C
the ac input box (C
ALLOUT
7.
If necessary, repeat steps 1 through 6 to install a second ac input box.
8.
Turn O
each ac input box
N
by pressing the I on the ac
power switch (C
ALLOUT
9.
Verify that all power supply status LEDs turn O
Power Distribution
1) with either slot A or slot B in the
ALLOUT
2).
ALLOUT
4) from the ac power source to
ALLOUT
1).
1).
1
2
.
N
UltraSCSI RAID Enclosure 6–19
CXO5186B
CXO5488B

Advertisement

Table of Contents
loading

Table of Contents