Operating the UltraSCSI Enclosure
2–10 UltraSCSI RAID Enclosure
Table 2–4
Restoring the DC Power
1.
If there are no expansion enclosures, go to step 3.
2.
If there are expansion enclosures, momentarily press the EMU alarm
control switch (C
ALLOUT
3.
Momentarily press the EMU alarm control switch (C
the master enclosure.
4.
Verify that the array controller restores the subsystem to an
operational state.
Turning Off the Subsystem
Adding enclosures or moving the subsystem might require removing
all power from the subsystem. Complete the procedure in Table 2–5
to remove all power.
1) on each expansion enclosure.
1
2
3
4
CXO6302A
1) on
ALLOUT