Applying Power; Figure 2-2 Ac Power Distribution - Compaq StorageWorks DS-BA370 Series User Manual

Ultrascsi raid enclosure
Table of Contents

Advertisement

Operating the UltraSCSI Enclosure
AC Input Box
CXO5113A
2–6 UltraSCSI RAID Enclosure

Applying Power

Initial power application is a matter of turning on the ac input boxes
located in the lower left and right corners of the enclosure (see Figure
2–2, labels A and B). Pressing the I on the ac power switch applies ac
power only to the shelf power supplies on the associated power bus
(bus A or B).
Apply power in the following sequence:
1. All expansion enclosures
2. Master enclosure
Figure 2–2 AC Power Distribution
AC Input Box and SBB Shelf
Power Supply Locations
1
4A
19 20 21 22 23 24
3A
13 14 15 16
2A
7
8
9
10
1A
1
2
3
4
A
Note
1.
2
2.
5A
4B
Shelf 4
Shelf 3
17
18
3B
Shelf 2
11
12
2B
Shelf 1
5
6
1B
B
CXO5808B
Figure C
ALLOUTS
Power bus A
Power bus B

Advertisement

Table of Contents
loading

Table of Contents