Compaq StorageWorks DS-BA370 Series User Manual page 142

Ultrascsi raid enclosure
Table of Contents

Advertisement

Power Distribution
6–16 UltraSCSI RAID Enclosure
Table 6–4
Installing a Power Supply (Continued)
3.
Insert the power supply
into the guide slots and
push it in until the bezel
mounting tabs engage
the shelf, fully seating
the power supply.
4.
Connect the power cord to the power supply.
5.
For a cold swap method, go to step 6 to turn O
6.
If there are no expansion enclosures, go to step 7.
If there are expansion
enclosures, turn O
N
input boxes for each
expansion enclosure by
pressing I on each ac power
switch (C
1).
ALLOUT
7.
On the master enclosure,
turn O
all the ac input
N
boxes by pressing I on each
ac power switch
(C
1).
ALLOUT
8.
Verify the array controller places the subsystem into an operational
state.
9.
Verify that both power supply status LEDs are O
all the ac
1
2
CXO-4314A-MC
the subsystem.
N
CXO5488B
.
N

Advertisement

Table of Contents
loading

Table of Contents