Gilera 2008 MSS Nexus User Manual page 174

Table of Contents

Advertisement

Injection
Check the efficiency of the injection load remote
control: Check the resistance of the energising coil
between pins 86 and 85: 40 to 80 Ohm
Apply a voltage of 12V to pins 86 and 85; make
sure that there is continuity between pins 30 and
87 of the remote control.
INJEC - 174
MSS Nexus 300 i.e. E3 ( 2008)

Advertisement

Table of Contents
loading

This manual is also suitable for:

2008 mss nexus 300 i.e. e3

Table of Contents