Gilera 2008 MSS Nexus User Manual page 171

Table of Contents

Advertisement

MSS Nexus 300 i.e. E3 ( 2008)
Check during regular operation by placing the ap-
propriate tool between the pump and the injector.
With the battery voltage> 12 V check that the fuel
pressure is 2.5 BAR and that the input current is
1.4 to 1.8 A
With the battery voltage > 12 V, check the pump flow rate by disconnecting from the injector the pipe
equipped with the pressure gauge of the appropriate tool. Make a graded burette available with a flow
rate of approximately 1 L. Rotate the pump using the active diagnosis of the palm top computer. Using
a pair of long flat needle-nose pliers, choke the fuel pipe making the pressure stabilise at approx. 2.5
BAR. Check that, in fifteen seconds, the pump has a flow rate of around 110 cm³.
Specific tooling
020480Y Petrol pressure check set
Fuel filter check
Disconnect the terminals from the electric pump
Remove the screw shown in the photograph
Injection
INJEC - 171

Advertisement

Table of Contents
loading

This manual is also suitable for:

2008 mss nexus 300 i.e. e3

Table of Contents