Gehl RT175 Operator's Manual page 5

Compact track loader
Hide thumbs Also See for RT175:
Table of Contents

Advertisement

The following checklist is an important reminder of valuable
information and inspections that MUST be made before the
machine is delivered to the customer. Check off each item after
the prescribed action is taken.
PRE-DELIVERY CHECK:
 Machine has not been damaged in shipment. Check for
such things as dents and loose or missing parts. Correct or
replace components as required.
 Battery is securely mounted and not cracked. Be sure
cable connections are tight.
 Cylinders, hoses and fittings are not damaged, leaking or
loosely connected.
 Cooler/radiator hoses and fittings are not damaged,
leaking or loosely connected. Radiator is filled to proper
level and has the proper anti-freeze protection.
 Filters are not damaged, leaking or loosely secured.
 Machine is properly lubricated and no grease fittings are
missing or damaged.
 Hydraulic system reservoir, engine crankcase and drive
gearcases are filled to their proper levels.
 Engine radiator is filled to proper level and has proper
anti-freeze protection.
 All adjustments are made to comply with settings
provided in the Maintenance chapter of this manual.
 All guards, shields and decals are in place and secured.
 Model and serial numbers for the machine are recorded in
the spaces provided on this page.
IMPORTANT
Start the engine and test run the machine while
checking that all controls operate properly.
 All drive and hydraulic controls operate properly and are
not damaged or binding.
 Drive controls are properly adjusted for correct neutral
position.
 The parking brake, along with the lock-out devices, are
activated with the unit stationary (no pilot control
pressure).
 All instrument panel gauges, indicator lights, etc. function
properly.
 All installed lights, such as work lights, function properly.
 All hydraulic functions are NOT operational with the arm
rests/safety bars in the raised, lock-out position.
 Hydraloc™ system functions properly as described in the
Operator's Manual.
Printed in U.S.A.
I acknowledge the pre-delivery procedures were performed on
the machine as outlined on this page.
________________________________________________
Dealership's Name
________________________________________________
Dealer Representative's Name
________________________________________________
Date Checklist Filled Out
________________________________________________
Model & Serial Number
________________________________________________
Engine Serial Number
AT-DELIVERY CHECK:
The following checklist is an important reminder of valuable
information that MUST be passed on to the customer at the
time of delivery. Check off each item as you explain it to the
customer. Review with the customer the contents of this
Operator's Manual, especially:
 The Index for quickly locating topics.
 The Safety and Operation chapters, for information
regarding safe operation of the machine.
 The Maintenance and Troubleshooting chapters, for
information regarding proper maintenance of the machine.
Explain that regular lubrication and maintenance are
required for continued safe operation and long machine
life.
 A copy of the product warranty is included on the inside
front cover of this Operator's Manual.
 Give this Operator's Manual and the AEM Safety Manual
to the customer, and instruct the customer to read and
completely understand the content of each manual before
operating the machine.
 Explain that the customer MUST consult the engine
manual (if provided) for related specifications, operating
adjustments and maintenance instructions.
 Completely fill out the Owner's Registration, including
customer's signature, and return it to the company.
________________________________________________
Customer's Signature
________________________________________________
Date Delivered
RETAIN FOR DEALER'S RECORDS
iii
918468/EP0313

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt210

Table of Contents