Gehl RT175 Operator's Manual page 124

Compact track loader
Hide thumbs Also See for RT175:
Table of Contents

Advertisement

Maintenance
Fig. 107 – Track Installed Before Tensioning
15. Start the machine, open the engine compartment
and press the bottom of the track tension service
switch (N, Fig. 108), to set the track tension
cylinders into the operating (extended) position.
N
Fig. 108 – Track Tension Switch
16. Once the track tension cylinder has returned to
the operating (extended) position, re-install
cylinder stop (K, Fig. 109).
918468/EP0313
X
Fig. 109 – Tension Cylinder Stop
17. Operate the track drive forward/back to ensure
the track is properly seated. Adjust track
positioning if necessary.
18. Remove blocking and lower the machine to the
ground.
118
K
Printed in U.S.A.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt210

Table of Contents