Mitsubishi GT16 User Manual page 94

Hide thumbs Also See for GT16:
Table of Contents

Advertisement

(4) CC-Link connection (Intelligent device station)
• Strip the outer insulation layer at both ends of the cable by the length shown below to expose the braided
shield for grounding. (For grounding with cable clamps (refer to Section 5.4.3.))
• Attach ferrite cores to the cable in the positions as illustrated below.
• CC-Link dedicated cable for connecting the GOT and PLC.
GOT side
130
(5.12)
• CC-Link dedicated cable for connecting the GOT and GOT
GOT side
130
(5.12)
(5) CC-Link IE Feild Network connection
• Strip the outer insulation layer at both ends of the cable by the length shown below to expose the braided
shield for grounding. (For grounding with cable clamps (refer to Section 5.4.3.))
• Attach ferrite cores to the cable in the positions as illustrated below
GOT side
120 or
less
(4.72)
230 or less
5 - 17
5.4 Precautions for Wiring/Connecting the EMC Directive-Compliant Product
(ZCAT3035-1330)
40
230 or less
(9.06)
(1.57)
(ZCAT3035-1330)
40
230 or less
(9.06)
(1.57)
(ZCAT3035-1330)
40
(9.06)
(1.57)
Ferrite Core
40
(1.57)
Ferrite Core
40
(1.57)
Ferrite Core
40
(1.57)
PLC side
130
(5.12)
400 or less
(15.75)
Unit : mm (inch)
GOT side
130
(5.12)
230 or less
(9.06)
Unit : mm (inch)
Controller side
400 or less
(15.75)
Unit : mm (inch)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Got 1000 gt16

Table of Contents