Mitsubishi GT16 User Manual page 93

Hide thumbs Also See for GT16:
Table of Contents

Advertisement

(c) For other bus connection cables
• Wind cable shield material around the cable, and pull out the grounding braided wire of the cable shield
material with the length shown below.
• Attach the ferrite core to the cable in the position as illustrated below and insert the braided wire for
grounding into the ferrite core.
GOT side
80
(3.15)
40 or less
(1.57)
(2) CPU direct connection and computer link connection
• Attach the ferrite core to the cable in the position as illustrated below.
GOT side
100 or less
(3.94)
(3) For MELSECNET/H connection (PLC to PLC network)
(a) For coaxial cable
• Strip the outer insulation layer at both ends of the cable by the length shown below to expose the outer
braided shield for grounding. (For grounding with cable clamps (refer to Section 5.4.3.))
• Attach ferrite cores to the cable in the positions as illustrated below.
GOT side
130 or
less
(5.12)
230 or less
(9.06)
(b) For optical fiber cable
• Processing of the cable is not required.
5.4 Precautions for Wiring/Connecting the EMC Directive-Compliant Product
Ferrite Core
(ZCAT3035-1330)
Cable shield material
Grounding braided wire
(200mm (7.87 inch))
Grounding braided wire
(50mm (1.97 inch))
Ferrite Core
(ZCAT3035-1330)
Ferrite Core
(ZCAT3035-1330)
40
(1.57)
(1.57)
PLC side
80
(3.15)
40 or less
(1.57)
PLC side
100 or less
(3.94)
PLC side
130 or
less
(5.12)
400 or less
40
(15.75)
Unit : mm (inch)
Unit : mm (inch)
Unit : mm (inch)
5 - 16
1
2
3
4
5
6
7
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Got 1000 gt16

Table of Contents