Figure 36: Screwing The 4-Oval Washer Plates - Mellanox Technologies Switch-IB User Manual

324-port edr infiniband switch-ib series switch platform hardware
Table of Contents

Advertisement

Installation
Assemble the 2 4-oval washer plates to the left and right chassis slides on the leaf side
Step 28.
(Figure
36) at 3.23-3.58Nm torque using 4 M5 pan-head screws on each side
(Figure
36).

Figure 36: Screwing the 4-Oval Washer Plates

Mellanox Technologies
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switch-ib 2

Table of Contents