Step 20.
Place the front lock-down bar at the edge of the chassis and align the holes in the lock-
down bar with the holes in the shelf. Screw down the lock-down bar. You will need the
10 hex head screws and washers for each lock down bar. DO NOT TIGHTEN
Step 21.
Screw down the second lock-down bar.
Step 22.
Remove the shelf extension and save for removal of the chassis.
Step 23.
Connect a valid ground, See Section 1.6.5, "Ground Connections," on page 32, for
detailed instructions.
Step 24.
Tighten the faceplate screws. See Figure 20.
Step 25.
Tighten the upper bracket to upper bracket offset screws. See Figure 23.
Step 26.
Tighten the lock down bars. See Figure 26.
Step 27.
Go to Section 3, "Chassis Power Up," on page 37 to power up the switch system.
1.6.4 Installing the Cable Holder
Now is the time to install the cable holder.
30
Figure 26: Lock Down Bars Bolt and Washer Order
Installation
Mellanox Technologies