Commissioning; Chapter Content - Siemens SINAMICS G150 Operating Manual

Converter cabinet units 75 kw to 800 kw
Hide thumbs Also See for SINAMICS G150:
Table of Contents

Advertisement

Commissioning

5
5.1

Chapter Content

This chapter provides information on the following:
• An overview of the operator panel functions
• Initial commissioning of the cabinet (initialization)
Entering the motor data (drive commissioning)
Entering the most important parameters (basic commissioning), concluding
with the motor ID
• Data backup
• Resetting parameters to the factory settings
Cabinet operator panel
PROFIBUS
Input terminals
-A60
Diagnosis
SINAMICS G150
Operating Manual
6
Setpoint channel Closed-loop control
10
Faults / alarms
Monitoring
7
M
~
Output terminals
-A60
Functions
Protective functions
5
5
8
9
5-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents