Route Cables - Centurion D2 Turbo Installation Manual

Domestic sliding gate operator for 250kg gates
Hide thumbs Also See for D2 Turbo:
Table of Contents

Advertisement

6. Fit the mounting studs to the
foundation plate and secure in place with
the stud locknuts.
Do not bend out the anchor
brackets.
Route Cables and Secure Foundation Plate
1. Route cables as determined in Section 7, Cabling Requirements.
2. Make sure that all cables and conduits
protrude at least 400mm above the
foundation plate once installed.
3. Securely concrete or bolt the foundation
plate in position.
page 24