Route Cables And Secure Base Plate; Route Required Cabling - Centurion D3 Installation Manual

Hide thumbs Also See for D3:
Table of Contents

Advertisement

3. Depending on the mounting method, either prepare a square hole for a concrete foundation, or drill
holes for RAWL bolts as shown in Figure 10.
When using a concrete foundation it is recommended that the operator baseplate be welded
to the track using a short length of flat bar. This makes it possible to complete the whole
mechanical and electrical installation, without having to wait for the concrete to set. After
completing the installation the concrete can be poured, and the operator left in manual mode
until the concrete has set.
300mm
400mm
Figure 10 Foundation Plate Mounting

Route cables and secure base plate:

4. Route cables as determined in the cabling plan (Figure 7), making sure that all cables protrude at
least 400mm above the baseplate once installed, as in Figure 11.
5. Securely concrete or bolt the baseplate in position as shown in Figure 10.
or
400mm
Page 18
M10 Nut
M10 Washer
Use two M12
plated nuts as
spacers.
M10 x 95
expansion
stud

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D5Cp72slidv3

Table of Contents