Required Tools And Equipment - Centurion D2 Turbo Installation Manual

Domestic sliding gate operator for 250kg gates
Hide thumbs Also See for D2 Turbo:
Table of Contents

Advertisement

5. Required Tools and Equipment

Pull scale - 50kg
Spanner - 17mm; 10mm
Screwdriver - 3.5mm flat
Allen key - 6mm; 4mm
Crimping tool and pin lugs
Side cutters
Hacksaw
Spirit level
Measuring tape
If casting foundation plate into concrete:
Pick
Spade
Long-nosed pliers
If bolting foundation plate onto existing plinth:
Drilling equipment
Masonry bits to suit rawlbolts being used
If retrofitting foundation plate to an existing D3 foundation plate:
Grinder
If welding foundation plate and/or rack to gate:
Welding equipment
G-clamp, 6 inch x 2
If left-hand side of gearbox is mounted close to a post:
Socket wrench
Extension piece
17mm socket
If fastening rack to gate:
Drilling equipment
TEK screw socket
page 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D2 turbo low-voltage

Table of Contents