Do you have a question about the D3 and is the answer not in the manual?
Questions and answers
Gibson
April 13, 2025
Hello. How do i add new remote on d5v1.073. I cannot find the master
1 comments:
Mr. Anderson
April 13, 2025
To add a new remote to the Centurion D3 when the master remote for the D5V1.073 is not available, follow these general steps:
1. Access the Controller: Open the gate motor housing to access the CP80 controller.
2. Enter Programming Mode: - Press and hold the programming button on the controller until the LED lights up or blinks (exact behavior depends on the model).
3. Select Remote Learning Mode: - Press the button corresponding to remote programming (refer to the control board labeling if available).
4. Press the New Remote Button: - Press and hold a button on the new remote until the controller LED confirms programming (usually by flashing or turning solid).
5. Exit Programming Mode: - Press the programming button again or wait for timeout (LED will turn off).
If the system requires the master remote to authorize adding new remotes and it is not available, you may need to reset the controller to factory defaults or use a programming cable or keypad (if supported) to add remotes.
Specific steps may vary by firmware version. If these steps do not work, consult the control board directly for labeled instructions.
Centurion Systems (Pty) Ltd 148 Epsom Avenue North Riding Gauteng South Africa Declares that the product: Product Name: D3 / D5 Sliding Gate Operator Product Options: All variants Conforms with the following specifications: Safety: IEC 60355-1:1991 & Am1:1994 & Am2:1999 For D3: EN 12453:2000 EN 12978:2003 when fitted with CE chip and a P36 Passive Sensitive Edge according to instructions.
10. The mains power supply of the automated system must be 22. Centurion Systems does not accept any liability caused by fitted with an all-pole switch with contact opening distance improper use of the product, or for use other than that for of 3mm or greater.
Fast Track Fast Track These abbreviated instructions are for the experienced installer who needs a checklist to get a standard installation up and running in the minimum of time. Detailed installation features and functions are referred to later in this manual. Mechanical Setup Action Read and understand all safety instructions...
Page 7
Fast Track Fast Track Electrical Setup Action Read and understand all safety instructions Page 5 Step 1 Connect all wiring: Page 24 Step 2 Get into programming mode: Page 24 Step 3 Remove all power. Fit the SET link. Reapply power. Set the gate limits: Step 4 Move gate half way and engage.
The D5 electronic controller utilizes the same proven surge protection philosophy that is used in all Centurion products. While this does not guarantee that the unit will not be damaged in the event of a lightning strike or power surge, it greatly reduces the likelihood of such damage occurring. The earth return for the surge protection is provided via the mains power supply earth.
Specifications Specifications Overall Dimensions When fitting a theft resistant cage, the space required for an installation may have to be increased. All dimensions shown in millimetres Figure 1 Overall Dimensions Page 9...
Page 10
Temperature range -10° to +50°C -10° to +50°C Housing protection IP55 IP55 Control card * CP80 CP80 Zincroshield Corrosion protection (baseplate) Zincroshield 12kg Mass of unit (packed) including 7,5Ah Battery 13.5kg * D3 and D5 have different micro-controller versions Page 10...
Site Requirements Site Requirements Ensure that pedestrian gates which are built into the sliding gate can WARNING be secured in the closed position and are provided with at least a weatherproof normally closed safety switch that is connected to the IRB or LCK input of the control card.
Page 13
End Stops 1. End stops are mandatory and must be fitted to prevent accidental injury or death should the gate overrun its limits for any reason. Endstop Endstop Ø16mm Fit end stops capable of stopping the gate moving at rated speed. Make more than to ensure gate will not jump over end stop.
Site Considerations Site Considerations Install the gate operator only if: 1. It will not pose a hazard to the public. 2. There is sufficient clearance to a roadway and/or public thoroughfares. 3. The installation will meet all municipal and/or local authority requirements once completed. 4.
Cabling Requirements Cabling Requirements Depending on site requirements and accessories, not all cables may be required. LEGEND 220V AC mains cable via mains multistranded isolator switch (3 core LNE 0,5mm Pedestrian key switch (if required) (2 Steel Wire Armour cable)*†, core 0,5mm multistranded Infrared beams or safety edge (if...
Lubrication (D5 only) Lubrication (D5 only) The D3 is factory lubricated and therefore requires no additional attention. In order to prevent possible leakage during shipping, the D5 is ATTENTION shipped with no oil inside the gearbox . A bottle containing 80 ml of...
Operator Installation Operator Installation Locate operator position 1. To ensure operator does not protrude into driveway, install base plate at least flush with the driveway entrance. 2. Determine a suitable position and vertical height for the operator by considering Figures 9, and 10. With careful selection of the rack configuration, and operator vertical height, mounting of the rack could in some cases be greatly simplified.
3. Depending on the mounting method, either prepare a square hole for a concrete foundation, or drill holes for RAWL bolts as shown in Figure 10. When using a concrete foundation it is recommended that the operator baseplate be welded to the track using a short length of flat bar.
Figure 11 Route Cables Through Baseplate Mount the operator: 6. Fit M10 nuts and washers to the base as shown in Figure 12. Take care to adjust the nuts to be 7mm clear from the base to allow for later adjustment. NB: Remember to fit washers. M10 Washer M10 Nut Figure 12 Prepare to Mount Operator...
Figure 14 Secure the Operator Figure 13 Cable Route 7. Remove the knock-outs from the gearbox and feed the cables through the holes, while fitting the gearbox to the base plate (Figure 13). 8. Secure the motor in place with 6 flat washers, 3 spring washers and 6 nuts supplied, as shown in Figure 14.
Page 21
Steel Rack RAZ Rack Weld Raz Rack Steel Rack TEK Screw (self drilling Bracket and tapping screw) ±300 mm When fitting RAZ rack it is easier to start on the right and work towards the left. 200 - 300mm When joining steel rack sections it is important to maintain the correct tooth GATE PEDESTRIAN...
The position of the origin marker affects how far the gate will open for the PEDESTRIAN opening feature. Locating the marker at a distance greater than the recommended distance will increase the pedestrian opening. A CE chip fitted to the CP80 CENTURION SYSTEMS CP80 V1.2 controller is indicated by CHARGE (LED)
Pillar GREATER THAN 500mm. IF A CE CHIP IS FITTED, GREATER THAN 1000mm (GATE SHOWN IN CLOSED POSITION) ORIGIN MARKER ORIGIN SENSOR ORIGIN MARKER ORIENTATION Figure 19 Origin marker Location 13. Open the gate until the origin marker is in line with the origin sensor and adjust the clearance between the origin sensor and origin marker to between 5 and 10mm (Figure 20).
Electrical Set-up Electrical Set-up 1. Always check that the mains isolator in the electrical panel is in the OFF WARNING position, and that all high voltage circuits (more than 42.4V) are completely isolated from the mains supply before doing any work. 2.
Page 25
Figure 22 Slide gate approximately half way open TEST Pushbutton CENTURION SYSTEMS CP80 V1.2 CHARGE (LED) (LED) TEST DC CHARGER INPUT DOSS SERIAL # STATUS AUXILIARY FUSE 3A F/B (LED) (LED’s) Battery Charge Connector MOTOR - BATTERY + LIGHT 12V TRG IRB FRX LED PED LCK Figure 23 CP80 Test Pushbutton and Battery Connector Locations CENTURION SYSTEMS CP80 V1.2...
Page 26
Automatic Set-up Routine Gate starts at “crawl” speed to open gate. If gate closes, remove power and reverse motor wires (see page 39) and restart the procedure from step 6. See Setup troubleshooting Guide, page 34, step 10.2) Gate hits “open” end stop and reverses direction running at crawl speed.
For a faster setup, press and hold the TEST button during the automatic set-up routine. The speed will increase to FULL speed while the button is depressed, but be sure to not run the gate into the end stops at full speed. After the Automatic Set-up Routine has been completed, the Pedestrian opening may be increased by momentarily pulsing the PED input to COM.
Page 28
20. L1 will flash once then go off, twice in short succession then go off, 3 times then go off, etc. Release the TEST button when the number of flashes is the same as the Feature number to select. Example 1: To set the MODE OF OPERATION to CONDOMINIUM (That is Feature number 4, to a status of 2 according to the table on page 43) Press and hold...
STATUS light will start flashing at an even rate. Count all the flashes, and release the TEST button when the number of flashes is the same as the COUNT value required. Example 2: Set the AUTO-CLOSE TIME to 10 seconds (That is Feature number 3, to a COUNT value of 10): First select the Feature number 3 as in steps 5 to 7.
Page 30
CONDOMINIUM MODE (FEATURE 4-2) - Any trigger will cause a gate, which is closed or closing to open or re-open. If not already active the auto-close will automatically be turned on when condominium mode is selected. It is only the auto-close signal, which can close a gate in condominium mode.
2 seconds). The contact can be used to operate a lamp, which will warn that the gate is about to open. Selection of pre-flashing is done in FEATURE 10. Three modes and OFF are selectable (The factory default is OFF): Mode 1 - Light comes on only while gate is in motion.
A momentary normally-open contact from a pedestrian key switch, pushbutton, keypad, radio receiver etc. which will cause the gate to open to the Pedestrian position. The gate opens only after the adjustable pre-flash time (default - 2 seconds). If the contact is held closed the auto- close is suspended until the contact reopens.
Set-up Troubleshooting Guide Set-up Troubleshooting Guide SET-UP PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM STEP SET light is not on: 4 or 18 Check that the SET link is correctly fitted. Fit and remove the link a few times to ensure good contact, restart from step 2. L2 is not on: All sources of power on the card must be removed.
Page 34
10.6 Gate does not open to ! Origin marker not positioned correctly. (See Figure 19) pedestrian opening. Gate does not stop at Continuous trigger on PED input. pedestrian but continues Origin Marker not positioned correctly. all the way to the open end stop.
Fault Finding Guide Fault Finding Guide PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM Gate does not move: Check that you are out of programming mode , SET light must be OFF. LCK (lockout) input activated . Green LCK light should be IRB (IR beams) input activated (Gate will not close once open) .
Page 36
Fault Finding Guide Continued... PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM B: False Check for false collisions with procedure Gate moves a short distance collision detection , later in this section (STATUS light and stops: could also flash 4 times if the number of detected collisions exceeded the COLLISION COUNTER feature value).
Page 37
Fault Finding Guide Continued... PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM Intermittent fault Gate opens to pedestrian on PED (pedestrian) input. Check wiring, and key switch operation. and closes B: False collision detection. CP80 If the problem is still not solved, the main controller might be faulty.
Page 38
Fault Finding Guide Continued... PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM condition of the battery leads, Low Battery Check the terminals and connectors. Look for and correct all loose connections and Voltage Condition (STATUS light flashes 3 times) signs of corrosion. (Continued) The battery might be discharged.
Page 39
Fault Finding Guide Continued... PROBLEM POSSIBLE CAUSES & SOLUTIONS TO PROBLEM harness is securely plugged False Collision Detection Check that the sensor wire into the CP80 (master controller) into the DOSS sensor. (STATUS light could flash 4 times to indicate that DOSS sensor Check that the is securely clipped into the...
CP80 Signal Connections CP80 Signal Connections DOSS SERIAL # STATUS AUXILIARY FUSE 3A F/B (LED) (LED’s) For a detailed description of terminal functions, refer to C o n t r o l l e r Te r m i n a l Features on Page 31.
12V DC lead acid battery (Amp/hour rating to BLACK BATT - suit) BATT BATT MOTOR Mains Fuse - 1A Slow-blow (T) size (5x20mm) MOTOR 20A Slow-blow fuse For PSU operated D3 or D5 operators, use a CP80PSU controller or a modified equivalent. Page 42...
Recommended Earthing for Effective Recommended Earthing for Effective Lightning Protection Lightning Protection 220V AC AUX OUTPUT Push-on Connector PSU Unit 220V AC INPUT Quick Release Link Optional lightning arrester for areas with high lightning incidences Ring Ring Baseplate Operator earth Earth Spike Figure 25 Lightning Protection Connections 1 .
CP80 Controller Features CP80 Controller Features FEATURE STATUS or COUNT STATUS FEATURE COUNT DESCRIPTION DESCRIPTION VALUE NUMBER VALUE Gate Limit Settings See detailed instructions on page 25 Auto-close OFF (Default) 15 seconds (Default) Auto-close Time 1 Flash = 1 second STANDARD (Default) CONDOMINIUM Mode of Operation...
LED Indicator Lights LED Indicator Lights The controller is fitted with diagnostic LED's (Light Emitting Diodes) that assist with the set-up and maintenance of the gate. Table 3 provides a description and purpose of the indicator LED's. See page 40 for location.
10.Centurion Systems (Pty) Ltd does not accept any liability caused by improper use of the product, or for use other than that for which the automated system was intended.
Page 48
CENTURION THE AUTOMATIC CHOICE CENTURION SYSTEMS (PTY) LTD HEAD OFFICE: TEL: +27 (0)11 699-2400, FAX: +27 (0)11 704-3412 or 462-6669 148 EPSOM AVENUE, NORTH RIDING P .O. BOX 506, CRAMERVIEW, 2060 SOUTH AFRICA WEB: http://www.centsys.co.za General information e-mail: info@centsys.co.za FOR TECHNICAL SUPPORT CONTACT: SOUTH AFRICA EAST RAND.
Need help?
Do you have a question about the D3 and is the answer not in the manual?
Questions and answers
Hello. How do i add new remote on d5v1.073. I cannot find the master
To add a new remote to the Centurion D3 when the master remote for the D5V1.073 is not available, follow these general steps:
1. Access the Controller: Open the gate motor housing to access the CP80 controller.
2. Enter Programming Mode:
- Press and hold the programming button on the controller until the LED lights up or blinks (exact behavior depends on the model).
3. Select Remote Learning Mode:
- Press the button corresponding to remote programming (refer to the control board labeling if available).
4. Press the New Remote Button:
- Press and hold a button on the new remote until the controller LED confirms programming (usually by flashing or turning solid).
5. Exit Programming Mode:
- Press the programming button again or wait for timeout (LED will turn off).
If the system requires the master remote to authorize adding new remotes and it is not available, you may need to reset the controller to factory defaults or use a programming cable or keypad (if supported) to add remotes.
Specific steps may vary by firmware version. If these steps do not work, consult the control board directly for labeled instructions.
This answer is automatically generated