Centurion D2 Turbo Installation Manual page 31

Domestic sliding gate operator for 250kg gates
Hide thumbs Also See for D2 Turbo:
Table of Contents

Advertisement

Route Cables and Secure Foundation Plate
1. Route cables as determined in Section 7, Cabling requirements.
2. Make sure that all cables and conduits
protrude at least 400mm above the
foundation plate once installed.
Cable entry is allowed for in the far left-
hand side corner of the gearbox.
3. Securely anchor the foundation plate in
concrete or bolt it in position.
Mount the gearbox
1. Fit the orange height-adjustment nuts to
the base as shown in Figure 28 to level
the gearbox
page 27