Operating Notes - HP ProCurve 2610-PWR Management And Configuration Manual

Procurve 2610 series procurve 2610-pwr series
Hide thumbs Also See for ProCurve 2610-PWR:
Table of Contents

Advertisement

Switch Memory and Configuration
Using Primary and Secondary Flash Image Options

Operating Notes

Default Boot Source. The switch reboots from primary flash by default
unless you specify the secondary flash.
Boot Attempts from an Empty Flash Location. In this case, the switch
aborts the attempt and displays
Interaction of Primary and Secondary Flash Images with the Current
Configuration. The switch has one startup-config file (page 6-3), which it
always uses for reboots, regardless of whether the reboot is from primary or
secondary flash. Also, for rebooting purposes, it is not necessary for the
software image and the startup-config file to support identical software fea­
tures. For example, suppose you have just downloaded a software upgrade
that includes new features that are not supported in the software you used to
create the current startup-config file. In this case, the software simply assigns
factory-default values to the parameters controlling the new features. Simi­
larly, If you create a startup-config file while using a version "Y" of the switch
software, and then reboot the switch with an earlier software version "X" that
does not include all of the features found in "Y", the software simply ignores
the parameters for any features that it does not support.
6-22
Image does not exist
Operation aborted.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents