HP Brocade BladeSystem 4/12 User Manual page 416

Dcfm professional user manual (53-1001773-01, june 2010
Hide thumbs Also See for Brocade BladeSystem 4/12:
Table of Contents

Advertisement

14
Creating a new encryption group
13. Click Next.
FIGURE 145
14. Click Next to confirm the displayed information.
384
The Confirm Configuration panel displays the encryption group name and switch public key
certificate file name you specified, shown in
Confirm Configuration dialog box
The Configuration Status displays, as shown in
slightly depending on the key vault type.
A progress indicator shows that a configuration step is in progress. A green check mark
indicates successful completion of all steps for that Configuration Item. A red stop sign
indicates a failed step.
All Configuration Items have green check marks if the configuration is successful. A
message displays below the table, indicating that the encryption switch was added to the
group you named, and the public key certificate is stored in the location you specified.
Figure
145.
Figure
146. The configuration status steps vary
DCFM Professional User Manual
53-1001773-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brocade bladesystem 4/24Dcfm 10.4.x

Table of Contents