Before You Begin

Plan Your Installation

You should have a detailed plan of how the displays are to be configured. The plan
should include calculations for the following:

Prepare Your Installation Location

You should have prepared the area where you will install the LCD tiles. The mounting
structures must be fully designed to accommodate the installation of the LCD tiles.
You must also make sure there is enough room for the off-board components and
any equipment racks that might house these components.
16
• Floor/wall load. Make sure the floor/wall is strong enough to support the
weight of the whole Runco WindowWall system.
• Each power supply module requires a 20A circuit for 115V operation.
• At least 8'' (203mm) of space above the LCDs so they can be moved up and
open for service. The recommended amount of space is 10" (254mm).
• Access to both sides of the Quad Input Manager Module and the power supply
module.
• Cable runs
• Ventilation and cooling requirements. Although most of the heating elements
are not in the LCD itself, it is still important that you have proper cooling and
ventilation for the entire Runco WindowWall and its off-board components.