Installation Checklist
Use this quick checklist to ensure you have performed the installation steps in the
correct order.
1
2
3
4
Unpacking and Checking Accessories
The following diagram shows a basic connection of the different cables that connect
to the different modules.
Power cable
Power cable
Unpack and install the LCD mount brackets.
Install Quad Input Manager Modules and power supply modules.
Run cables between LCD mount and brackets.
Install LCD tiles.
Quad Input Manager Module A
Power Supply Module
AC power cord
Quad Input Manager Module B
Power Supply Module
AC power cord
Runco WindowWall Installation Guide
IR sensor cable
Data Cat 6 cable
Video Cat 6 cable
Wall outlet
Power cable
Wall outlet
Installation Checklist
LCD
17