Placing Off-Board Module Equipment

Before you install your LCDs, first place your Quad Input Manager Modules and
power supply modules where they will be installed.
Note:

Plugging In Cables to the Off-Board Modules

Once the modules are placed, complete the following steps.
1
2
3
If the IR sensor will be mounted near the LCD wall, route the IR sensor cable now.
You need a 20A circuit for each power supply module.
For each Quad Input Manager Module, plug the necessary data cables into the
gray COMM connector and the video cables into the orange VIDEO connector.
For each set of the Quad Input Manager Module and the power supply module,
plug one end of a power cable into the 24V connector on the Quad Input
Manager Module and the other end into the 24V connector on the power supply
module. Do this for each set of Quad Input Manager Modules and power supply
modules.
For each set of the Quad Input Manager Module and the power supply module,
plug one end of the power supply monitor cable into the PS MON connector of
the Quad Input Manager Module and the other end into the PS MON connector
of power supply module.