2.
Connect the Ethernet cables from the switches in rack 1 to the switches in rack 3. See also
26.
Rack 1
From Rack 1
Switch 2510 24 port 22
Switch 2810 24G port 22
Switch 2510 24 port 21
Switch 2810 24G port 21
3.
Secure Ethernet cables to the right side of the rack using a Velcro® tie.
72
Hardware Installation
Rack 3
To Rack 3
Switch 2510 24 port 22
Switch 2810 24G port 22
Switch 2810 24G port 21
Switch 2510 24 port 21
Figure