Starting And Reviewing Background Jobs - HP StorageWorks 9000 - Virtual Library System User Manual

Hp storageworks 9000-series virtual library system user guide (ag306-96027, march 2010)
Hide thumbs Also See for StorageWorks 9000 - Virtual Library System:
Table of Contents

Advertisement

The Complete with Errors status signifies that one or more read operations failed; this may mean
the job uncovered a disk error. If a disk error has occurred, the
211 on the Background Job tab displays a sum of errors and presents a link to view error detail
and drive recommendations.
% Complete — the percentage of cartridges read so far.
To delete jobs from the status table, check the jobs in the Select column, and then select Delete Selected.

Starting and Reviewing Background Jobs

The Background Job tab displays information for all previous and current Background jobs. The
Storage Pool and Compressibility Ratio fields contain the default information entered in the
Configuration tab.
To begin a Background job:
1.
If you want the job to stop after a particular time period, enter the test duration in the appropriate
field. Otherwise, leave the Unlimited box checked to allow the test to run indefinitely.
2.
If you want to restrict the maximum amount of data the job will write, enter the amount in GB in
the appropriate field. Otherwise, leave the Unlimited box checked to allow it to write any amount
of data.
3.
Select Start. The job appears in the status table and will run, reading and writing data
continuously, until the job duration is complete (if you added one) or until you cancel the job.
Select Cancel in the appropriate row to cancel a Background job.
NOTE:
During a job, one cartridge per storage pool involved in the job is created to support the background
process. This cartridge can be found under the VLS cartridge list prefixed with "StorageExerciser_."
You can only start one Background job at a time.
You must have at least 5 GB of free space on your VLS in order to run a Background job. If less than
5 GB is available, the Background job will fail.
The status table displays:
Start Time — the date and time the job began.
End Time — the date and time the job ended.
Current Iteration — the number of the current iteration of the read/write process.
Failed Iterations — the number of iterations that failed due to decompression error or other error.
Data Written — the amount of data in bytes that has been written for all iterations combined.
Data Read — the amount of data in bytes that has been read for all iterations combined.
Status — the state of the jobs can be In Progress, Cancelling, Cancelled, Complete, or Complete
with Errors.
The Complete with Errors status signifies that one or more read operations failed; this may mean
the job uncovered a disk error. If a disk error has occurred, view the
To delete jobs from the status table, check the jobs in the Select column, and then select Delete Selected.
210
Monitoring
"Log Monitor
Summary" on page
Log Monitor
Summary.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vls 9000

Table of Contents