HP StorageWorks 1606 - Extension SAN Switch Release Note page 71

Hp storageworks fos 6.3.0b release notes (5697-0360, april 2010)
Hide thumbs Also See for StorageWorks 1606 - Extension SAN Switch:
Table of Contents

Advertisement

ifName value returned for xGBE port in WebTools does not match
CLI output.
If the ITL nexus in tape (target containers with initiator) to handle multi-
plex/multistream environment is greater than 200, decreased perform-
ance is seen for some containers.
NPIV tape devices may not be seen by hosts due to name server not
sending subsequent PLOGI ACC following a sequence where NPIV
device sends LOGO before link down.
GbE ports on HP StorageWorks Extension SAN Switch or Multiprotocol
Extension Blade will continually showail No_Sync status if non-B-series
SFP was inserted and then replaced with B-series SFP.
Copper 1-GbE SFP can get into an illegal state on Extension SAN
Switch where no LED light is shown, but port is online and working.
FOS 6.3.0b fixes
Table 12
lists defects closed in the FOS 6.3.0b firmware release.
Table 12 FOS 6.3.0b closed defects
Closed defect summary
When an unsupported SFP is installed in an HP StorageWorks DC
SAN Director Multiprotocol Extension Blade, the amber LED flashes to
indicate a fault, as it should. However, if an optical cable is plugged
into the SFP, the amber LED extinguishes. The actual port status is un-
changed.
When Lossless DLS is enabled, WebTools incorrectly shows iodset
off, but the CLI shows that it is enabled.
In a rare case, a buffer leak in the rekey daemon causes an HP Stor-
ageWorks Encryption SAN Switch fault during rekey. A power cycle
is required to recover.
HP StorageWorks Encryption SAN Switch does not rejoin Encryption
Group after a reboot, resulting in a split Encryption Group.
Incorrect port shows I/O traffic on 2408 FCoE Switches and 10/24
FCoE Blades.
When launched from DCFM, WebTools fails with a license error.
The host cannot recover if a back-end tape target becomes unrespons-
ive during encryption switch-initiated commands.
Fixed in FOS 6.3.0a
Fixed in FOS 6.3.0a
Workaround prior to code change:
Reduce IT configurations (target
containers with initiators) to 200.
Fixed in FOS 6.3.0a
Fixed in FOS 6.3.0a
Workaround prior to code change:
Use portdisable and
portenable after inserting the
supported SFP.
Fixed in FOS 6.3.0a
Solution
Fixed in FOS 6.3.0b
Fixed in FOS 6.3.0b
Workaround prior to upgrade:
Use the CLI to view the configured
IOD state when IOD is enabled with
the Lossless DLS solution.
Fixed in FOS 6.3.0b
Fixed in FOS 6.3.0b
Fixed in FOS 6.3.0b
Fixed in FOS 6.3.0b
Fixed in FOS 6.3.0b
HP StorageWorks FOS 6.3.0b Release Notes
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks fos 6.3.0b

Table of Contents