Copy Group Status Summary Panel (Executing Ykquery) - HP StorageWorks P9000 Reference Manual

Business continuity manager software reference guide
Hide thumbs Also See for StorageWorks P9000:
Table of Contents

Advertisement

If m or q is specified in the AC column in the Manage Copy Groups panel without executing the
YKLOAD command, the Confirm Copy Group Load panel is displayed to request the copy group
load. For more information on the Confirm Copy Group Load panel, see
Load Panel" (page

Copy Group Status Summary Panel (Executing YKQUERY)

When q or f is specified in AC on the Manage Copy Groups panel, the YKQUERY command
executes and the Copy Group Status Summary panel, which displays the number of copy pairs in
individual copy pair statuses within a copy group, is displayed. When v is specified in AC, the
YKQUERY command that includes the specified VERIFY parameter is executed and the copy group
configuration is checked. When q is specified, the execution results of the YKQUERY command
are displayed. When f is specified, the execution results of the YKEWAIT command with the
TIMEOUT(0) parameter specified are displayed. When v is specified and there is a configuration
error, the YKQUERY return code and message are displayed in the Exception Message Panel panel.
If there is no configuration error, the Copy Group Status Summary panel is shown.
Figure 101 (page 121)
Status Summary panel.
120 ISPF Panels
181).
shows the transition of the operation panel starting from the Copy Group
"Confirm Copy Group

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xp p9500

Table of Contents