HP StorageWorks P9000 Reference Manual page 297

Business continuity manager software reference guide
Hide thumbs Also See for StorageWorks P9000:
Table of Contents

Advertisement

"from planned outage configuration."
end
end
/*
* Confirm that the status of the MYTCHS copy pair is one where a
* DeltaResync can be performed.
*/
address TSO "YKEWAIT STEM(DEMO_INFO.MYTCHS.) MSG(DEMO_MSG.)",
"GOTO(SWAPPING) TIMEOUT(10)"
/*
* Check the return code of YKEWAIT.
*/
if rc /= 0
then do
call printErrorMessage
exit
end
else
nop
/*
* Suspend the MYUR2 copy pair to change the status of MYUR2
* to one where a DeltaResync can be performed.
*/
address TSO "YKSUSPND STEM(DEMO_INFO.MYUR2.)",
"MSG(DEMO_MSG.) FLUSH"
/*
* Check the return code of YKSUSPND.
*/
if rc /= 0
then do
call printErrorMessage
exit
end
else
nop
/*
* Confirm that the status of the MYUR2 copy pair is one where a
* DeltaResync can be performed.
*/
address TSO "YKEWAIT STEM(DEMO_INFO.MYUR2.) MSG(DEMO_MSG.)",
"GOTO(SUSPEND) TIMEOUT(10)"
/*
* Check the return code of YKEWAIT.
*/
if rc /= 0
then do
call printErrorMessage
exit
end
else
nop
/*
* Execute a DeltaResync on the MYUR1 copy pair to change
* the status of MYUR1 to DUPLEX, and to change
Command details 297

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xp p9500

Table of Contents