Schedule Switchover; Performing Memory Tests - Cisco WS-SUP32-GE-3B - Supervisor Engine 32 Software Configuration Manual

Software configuration guide
Hide thumbs Also See for WS-SUP32-GE-3B - Supervisor Engine 32:
Table of Contents

Advertisement

Schedule Switchover

Schedule Switchover
The schedule switchover test is used to check the readiness of the standby supervisor engine to take over
in case the active supervisor engine fails or is taken out of service. You can run this test once or schedule
it to run on a regular (daily, weekly, or monthly) basis.
When setting the time for a schedule switchover on both supervisor engines, the switchover for the active
Note
and standby supervisor engines should be scheduled at least 10 minutes apart to reduce system downtime
if the switchover fails.
To configure a schedule switchover, perform this task:
Command
Step 1
show diagnostic content [module num]
Step 2
Router(config)# diagnostic schedule module {num |
active-sup-slot} test {test-id} {on mm dd yyyy
hh:mm} | {daily hh:mm } | {weekly day-of-week hh:mm}
This example shows how to schedule a switchover for the active supervisor engine every Friday at
10:00 PM, and switch the standby supervisor engine back to the active supervisor engine 10 minutes
after the scheduled switchover from the active supervisor engine occurs.
Router(config)# diagnostic schedule module 5 test 32 weekly Friday 22:00
Router(config)# diagnostic schedule module 6 test 32 weekly Friday 22:10
Router(config)#

Performing Memory Tests

Most online diagnostic tests do not need any special setup or configuration. However, the memory tests,
which include the TestFibTcamSSRAM and TestLinecardMemory tests, have some required tasks and
some recommended tasks that you should complete before running them.
Before you run any of the online diagnostic memory tests, perform the following tasks:
Turn off all background health-monitoring tests on the supervisor engine and switching modules using
Note
the no diagnostic monitor module num test all command.
Catalyst Supervisor Engine 32 PISA Cisco IOS Software Configuration Guide, Release 12.2ZY
51-10
Required tasks
Isolate network traffic by disabling all connected ports.
Do not send test packets during a memory test.
Remove all switching modules for testing FIB TCAM and SSRAM on the policy feature card
(PFC3B) of the supervisor engine.
Reset the system or the module you are testing before returning the system to normal operating
mode.
Chapter 51
Purpose
Displays the online diagnostics configured for a
module. Use this command to obtain the test ID for the
schedule switchover.
Sets up the schedule switchover test for a specific date
and time for the supervisor engine.
Configuring Online Diagnostics
OL-11439-03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst supervisor engine 32 pisa

Table of Contents