Installation
6.3.3

Install the charge post on the foundation

Preliminary requirements
Procedure
1. Carefully lower the charge post on the
foundation with a hoisting equipment
or a forklift truck. Refer to section
5.6.1.
2. Make sure that the holes in the charge
post (A) and the foundation (B) are
aligned.
3. Install the fasteners (C) and the washers.
4. Tighten the fasteners to the correct torque. For the specification, refer to
section 12.13.
6.3.4

Install the cable gland plates

Preliminary requirements
Procedure
1. Install the nuts (A) of the cable glands
over the cables.
2. Install these parts:
a. Cable gland plates (B)
b. Fasteners (C)
3. Tighten the nuts of the cable glands.
44
Hoisting equipment or
forklift truck
Torque wrench
Caution: Make sure that
there is no kink in the
cables.
The door is open.
The protection cover is
removed.
Six fasteners M12 and
washers
Drop in anchors, for easy
installation and quality
Screwdriver, cross
Set of open spanners
C
B
A
6AGA000032-0115-EN | 004
C
A
B