Required Tools For Installation; Required Parts For Installation - ABB Terra HP Generation 4 CE Ionity Installation Manual

Table of Contents

Advertisement

Technical data
12.3

Required tools for installation

Parameter
Hoisting equipment or forklift truck
Swivel eye bolts or bolts with lifting
loops (to use with hoisting equipment)
As a standard, eye bolts are installed on
the cabinets. Refer to section 12.2.
Bolts
Hex keys
Open spanners
Torque socket wrench
Screwdriver, cross
Wire cutter
Wire stripper pliers
Crimp pliers
12.4

Required parts for installation

Part
Fasteners and washers, to connect the
charge post to the foundation
Fasteners and washers, to connect the
power cabinet to the foundation
Fasteners and washers, for the earthing
connections
Table 1: Cable lugs
Location Wire
Power
cabinet
Charge
post
68
Size
PE
M12
M10
M6
AC input power
M12
DC power
M12
PE
M8
M6
DC power
M12
Specification
Capable to lift the EVSE safely. Take into
account the dimensions, the mass, and
the center of gravity.
Thread M10 for the charge post
Thread M16 for the power cabinet
Size M16
Standard set of hex keys
Standard set of open spanners
For the torque specifications, refer to
section 12.13.
Size M5 (8 mm (0.3 in))
-
-
-
Specification
M12, class A2, length 70 mm (2.75 in)
M16, class A2, length 70 mm (2.75 in)
M11, class A2, length 70 mm (2.75 in)
Maximum width
Maximum length
[mm]
[in]
[mm]
35
1.4
70
25
70
50
12
0.5
40
39
1.5
70
39
1.5
70
22
0.9
40
12
0.5
40
39
1.5
40
6AGA000032-0115-EN | 004
[in]
2.7
70
1.6
2.7
2.7
1.6
1.6
1.6

Advertisement

Table of Contents
loading

Table of Contents