Charge Post, Inside - ABB Terra HP Generation 4 CE Ionity Installation Manual

Table of Contents

Advertisement

A
B
C
D
E
F
G
H
3.5.7

Charge post, inside

A
B
C
D
Part
Cooling unit
DC power busbars
Cable gland plates
PE busbar
Q1 RCD
X-10 terminal block
X-20 terminal block
CAN2ETH device
6AGA000032-0115-EN | 004
Door
Touchscreen
RFID reader and the payment
terminal (option)
Stop button
Connector holder
EV charge cable
Type plate
Parking sensor
H
G
F
E
D
C
Cooling unit
DC power busbars
Cable gland plates
PE busbar
I
Air inlet and outlet
J
Enclosure
K
Cable retraction system
L
Antenna
M
Hoisting points
N
LED strip
O
Plinth cover
E
Q1 RCD (residual current circuit
breaker)
F
X-10 terminal block
G
X-20 terminal block
H
-A4 CAN2ETH device
Function
To decrease the temperature of the charge cables
To connect the DC power cables
Glands for the cables to the charge post
To connect the PE wire
Residual current circuit breaker to connect or discon-
nect the AC auxiliary power to the charge post
To connect the AC auxiliary power cable
To connect the interlock and DC guard cable
To connect the Ethernet cable
Description
G
A
B
F
25

Advertisement

Table of Contents
loading

Table of Contents