Charge Post (Metal Frame) - ABB Terra HP Generation 4 CE Ionity Installation Manual

Table of Contents

Advertisement

Technical data
12.16.4

Charge post (metal frame)

D
G
A
B
C
D
E
F
G
H
Parameter
X1
Y1
Z1
X2
X3
Y2
Y3
Mass
Fasteners to connect the charge post to
the foundation (included in the delivery)
86
Y1
Z1
B
Foundation
Front cover
Rear gland plate
Left gland plate
Right gland plate
Cable trays
Tie plate
Holes for the fasteners
A
X1
F
H I
I
Footprint of the foundation
X1
Width of the foundation
Y1
Depth of the foundation
Z1
Height of the foundation
X2
Distance between the holes
X3
Distance between the hole and the
edge of the footprint
Y2
Distance between the holes
Y3
Distance between the hole and the
edge of the footprint
Specification
620 mm (24.4 in)
440 mm (17.3 in)
152 mm (5.98 in)
263 mm (10.4 in)
47 mm (1.90 in)
150 mm (5.9 in)
100 mm (3.40 in)
24 kg (52 lb)
6 x M12 Class 10.9 length 30 mm (1.2 in)
C
E
X2
X2
Y2
Y2
Y3
X3
6AGA000032-0115-EN | 004

Advertisement

Table of Contents
loading

Table of Contents