Procedure
1. Contact the manufacturer to order the
foundation for your EVSE. Refer to
section 1.12.
2. Dig the hole for the foundation.
3. Guide the cable conduits into the
cable entries (A) of the foundation.
4. Install the foundation in the hole.
5. Pull the cables through the cable
conduits in the foundation. Apply the
full cable slack.
For the specification of the cable slack, refer to section 12.14.1.
6. Fill the foundation with gravel or another substance to prevent rodents to enter
the cabinet.
4.4.3

Prepare a metal foundation for the power cabinet

Preliminary requirements
Procedure
1. Mark the position of the holes (A) on
the floor.
2. Drill and thread the holes.
Do not make holes in not
authorized locations, because this can
compromise the structural integrity of
the metal foundation.
3. Guide the cables to the grommet plate
(B).
4. Align the metal frame (C) with the
threaded holes.
5. Install the fasteners (D) with washers.
6. Tighten the fasteners to the correct
torque. For the specification, refer to
section 12.13.
6AGA000032-0115-EN | 004
Caution: Make sure that
the top surface of the
foundation is above the
ground level, to prevent
intrusion of water.
Drill with screw tap
Torque wrench
Pre-installation
A
Metal frame. Refer to
section 12.16.2.
If you have not included
the foundation in the
initial order, contact the
manufacturer to order the
foundation for your power
cabinet. Refer to section
1.12.