A transport company delivers the EVSE close to the site. The movement of the EVSE
to its final location is your responsibility.
If you need to store the EVSE before installation, obey the ambient conditions
for storage. Refer to section 12.11.
5.2

Inspect the EVSE on delivery

1. Do a check on the transport sensors. Refer to section 5.3.
2. Unpack the EVSE. Refer to section 5.4.
3. Do a check if the EVSE is in accordance with the order.
4. Do a check on the EVSE for damage.
5. If the EVSE shows damage or is not in accordance with the order, tell the
transport company immediately.
5.3

Do a check on the transport sensors

1. Do a check on the sensors (A) that
record the shocks during transport.
2. Do a check on the sensors (B)
that record the maximum tilt during
transport.
3. If the sensors (A) show a red
indication or the sensors (B) show a
tilt that is too high, do these steps:
a. Refuse the delivery of the EVSE.
b. Make a note on the delivery
c. Within three days of the delivery,
d. If you see damage on the cabinet, through the packaging material, do not
e. Contact the manufacturer and give details of the delivery problems. Refer to
5.4

Unpack the EVSE

1. Remove the packaging material.
2. Discard the packaging material. Refer to section 2.9.
3. Remove the cabinet from the pallet. Refer to section 5.5.
36
receipt.
ask the transport company for an
inspection.
unpack the EVSE.
section 1.12.
A
B
TiltWatch PLUS
ShockWatch
TiltWatch PLUS
ShockWatch
A
B
6AGA000032-0115-EN | 004

Advertisement

Table of Contents
loading

Table of Contents