 Conducted immunity test
Environmental phenomenon
Reference standard
Interface/Port
interface/port
Shielded cable
Data
communication
Unshielded cable
AC I/O
(unshielded)
Analog or DC I/O
Digital and analog
I/O
(unshielded)
All shielded lines
(to the earth)
AC power
Equipment power
DC power
AC I/O and AC
I/O power and
auxiliary power
auxiliary power
DC I/O and DC
output
auxiliary power
A.1.2 Installation Instructions for the EMC Standards
A PLC must be installed in a control box. The control box protects the PLC, and shields off the electromagnetic
interference generated by the PLC.
 Control box
-
Use a conductive control box.
-
To ensure that an inner plate contacts the control box well, users have to mask the paint on the bolts of the plate.
-
To ensure that the control box is grounded well even if there is high-frequency noise, users have to connect the
control box with a thick wire.
Fast transient burst
IEC 61000-4-4
Specific
Test level
1 kV
1 kV
2 kV
1 kV
1 kV
2 kV
2 kV
2 kV
2 kV
Radio frequency
High energy surge
IEC 61000-4-5
IEC 61000-4-6
Test level
1 kV CM
1 kV CM
2 kV CM
1 kV DM
1 kV CM
1 kV CM
2 kV CM
1 kV DM
0.5 kV CM
0.5 kV DM
2 kV CM
1 kV DM
0.5 kV CM
0.5 kV DM
A pp e nd ic es
interference
Test level
10V
10V
10V
10V
10V
10V
10V
10V
A_
10V
A - 3

Advertisement

Table of Contents
loading

Table of Contents