648 Port InfiniBand FDR Switch Platform Hardware Installation Guide
- 34 pan head screws for the caged nuts 20
for the shelf and 14 for the chassis face-
plate
- 32 lock washers – 20 for the lock down
bars and 12 for the upper brackets to
upper bracket offsets
- 2 upper brackets
- 1 open end ratchet wrench 10mm
- 1 socket wrench
- 2 extensions for the socket driver
- 4 flat washers for the shelf extension
- 1 nut Size M-8 for ground post
•
Parts included in the cable management installation kit:
- 1 cable management rack RH
- 16 caged nuts M6
Shelf extension
Upper bracket
Upper bracket
1.6.3.3 Container Mishandling
The container has shock and tilt stickers applied. These will turn red if the container has
been mishandled or roughly handled. Upon receipt of the container look for and inspect
the shock and tilt stickers to confirm that they have not tripped. If one or more are red
Mellanox Technologies
Figure 2: Installation Kit Parts
Upper bracket offset
- 20 flat washers– 8 for the lock down bars
and 12 for the upper brackets
- 32 hex head bolts – 20 for the lock down
bars and 12 for the upper brackets to upper
bracket offsets
- 12 flat head screws with locktite for the
upper bracket offsets
- 1 socket nut driver 8mm
- 1 socket nut driver 10mm
- 1 socket nut driver 14mm
- 1 box wrench
- 6 two hole lock washers for lock down bars
- 1 cable management rack LH
- 16 M6 bolts
Shelf
Rev 1.4
Lock-down bar
Flat head screws with
locktite
#6 hex head bolt
Phillips pan head
screw
#8 hex head bolt
Caged nuts
Lock washers
Lock washers
Flat washers
Flat washers
13