Installation Kit Parts - Mellanox Technologies Switch-IB User Manual

324-port edr infiniband switch-ib series switch platform hardware
Table of Contents

Advertisement

The switch platform uses 29U of rack space, 28U for the chassis and 1U for the shelf. The switch
ships from the factory with mounting holes on the spine side. There are upper brackets to connect
the leaf side to the rack near the top of the chassis, and there are two lock-down bars to secure the
chassis to the shelf. The weight of the switch is supported from underneath the unit by the shelf.
Due to the space required by up to 648 connector cables, it is recommended to use a
rack that is 120cm long and 80cm wide. This should allow for proper cable manage-
ment and enough ventilation to properly cool the chassis.
Before starting any procedure on the switch system:
1. Put an ESD prevention wrist strap on your wrist, and make sure there is good contact between
your body and the strap.
2. Plug the other end of the wrist strap to a valid ground. Make sure that this is a tight fit.
You may need a mechanical lift to move and insert the chassis into the rack.
It is recommended to use an AWG6 or 4mm diameter wire for grounding purposes.

2.5.1 Installation Kit Parts

Chassis Installation Kit
Table 5 - Chassis Installation Kit Items
a
Quantity
Item No.
1
1
2
1
3
1
4
2
5
8
6
8
7
12
8
30
9
2
Mellanox Technologies
Description
Shelf assembly
Riveted right chassis slide
Riveted left chassis slide
Support bracket
M5 spring washer
M5 pan-head screw
M6X16 pan-head screw
M6 cage nut
Perforated fixing bracket
Item No.
Quantity
M6 spring washer
11
26
M6 flat washer
12
8
Weld bracket
13
1
10-32 hex-head screw
14
12
Spring washer #10
15
12
M6X25 pan-head screw
16
18
Shelf arm bracket
17
4
Support bracket
18
2
Flat washer #10
19
12
Installation
Description
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switch-ib 2

Table of Contents