Operation; Distribution Networks & Connections Of The Pel; Single-Phase 2-Wire: 1P-2W1I - AEMC PEL 52 User Manual

Power & energy logger
Hide thumbs Also See for PEL 52:
Table of Contents

Advertisement

4.1 DISTRIBUTION NETWORKS & CONNECTIONS OF THE PEL
Connect the current sensors and voltage measurement leads on your installation
according to the type of distribution network.
NOTE: Always check that the arrow on the current sensor points
toward the load. If so, the phase angle will be correct for power
measurements and other phase dependent measurements. Otherwise,
the PEL Control Panel allows a current sensor's phase to be reversed
under certain

4.1.1 Single-Phase 2-wire: 1P-2W1I

For single-phase 2-wire measurements:
Connect the N measuring lead to the neutral conductor.
Connect the V1 measuring lead to the L1 phase conductor.
Connect the I1 current sensor to the L1 phase conductor.
32

4. OPERATION

Source
conditions.
L1
N
V2
600 V
max
V1
N
Figure 23
Power & Energy Logger Model PEL 52 - User Manual
Load
I2
I1
600 V CAT III
L1
N