Primary Tests; Testing System Integration - Siemens SIPROTEC 5 V7.80 Operation

Table of Contents

Advertisement

Commissioning

9.5 Primary Tests

9.5
Primary Tests

Testing System Integration

9.5.1
A requirement for the primary test is that prior tests (chapter
been completed successfully. Take note of the following before starting the test:
General Notes
!
DANGER
Danger due to hazardous voltages during the operation of electric devices
Noncompliance with the safety notes will result in death or severe injuries.
Only electrically qualified personnel may work on these devices. The electrically qualified personnel
²
must be thoroughly familiar with pertinent safety regulations and precautionary measures as well as
the warnings in this manual.
!
WARNING
Warning of hazards due to improper primary tests
Noncompliance with the safety notes can result in death, serious injuries, or considerable material
damage.
Primary trials may be performed only by qualified electricians who are familiar with the commis-
²
sioning of protection systems, the operation of the system and safety regulations and provisions
(switching, grounding, etc.).
You must perform switching operations for the commissioning. The described tests require that they can be
done without danger. They have not been conceived for operational checks.
You must follow pertinent safety regulations (VDE 105-100/A1, BGV A3/VBG 4).
Before starting work you must take note of the 5 safety regulations:
Isolate from the power supply
Safeguard against reclosing
Establish zero potential
Ground and short-circuit
Cover or cordon off neighboring live parts
206
9.3 Initial Startup
and
9.4 Secondary
SIPROTEC 5, Operation, Manual
C53000-G5040-C003-9, Edition 06.2018
Tests) have

Advertisement

Table of Contents
loading

Table of Contents