Fitting the Devices
3.1 Flush-Mounting Devices
All drillings in the area of the specific device cut-out widths (see
in the corresponding figures.
[dw_z2_2-6, 2, en_US]
Figure 3-6
36
Cut-Out Widths and Drilling Pattern – 1/3 Device, 2nd Device Row
Table
3-1) must comply with the dimensions
SIPROTEC 5, Operation, Manual
C53000-G5040-C003-9, Edition 06.2018