Figure 19 Sample Idle Screen Display - Quantum SuperLoader 3 User Manual

Quantum superloader 3: user guide
Hide thumbs Also See for SuperLoader 3:
Table of Contents

Advertisement

Figure 19 Sample Idle
Screen Display
(SuperLoader LTO
illustrated)
Once the power-on sequence completes and the SuperLoader is
ready, the LCD lists the SuperLoader options that are present and the
LED is steady green.
Ready
When the SuperLoader is idle for a while, the company
Note:
logo appears, the LCD backlight turns off (into power-save
mode), and the drive type (if known) or the date and time
appears.
After powering up the SuperLoader using the method
Note:
described above, you should use the switch on the front to
power off and on the SuperLoader.
2 When you first power on the SuperLoader, it automatically runs a
POST. During the POST, the left (green) LED flashes. After the POST,
the left (green) and right (amber) LED flash alternately back and
forth. Do one of the following:
If the SuperLoader powers on successfully, continue configuring
the SuperLoader (see Configuration).
SuperLoader User's Guide
Chapter 2 Installation and Configuration
Powering On the SuperLoader
HP Ultrium
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents