Initially Configuring the
DX-Series System
Turning on the DX100
The DX100 must be powered on in the following sequence:
Turn on both power switches on the storage arrays and controller (they
will not power on yet, but will power on automatically)
Turn on the circuit breakers of the AC power sequencers
Wait for all of the storage arrays to become ready
The system during the initial discovery process takes up to 3
Note:
minutes per storage array to become ready. Subsequent boots
during normal operation will take up to 10 seconds per array
to become ready. The system is ready when all connected
ports on the Fibre Channel switch show a green status.
Tech Tip:
Before you can access the web management pages from the DX-Series
controller, you must initially configure the system with an IP address and
0
other network information as well as create cartridges on all connected
storage arrays.
Initially configuring the DX-Series consists of the following steps:
Connecting to the DX-Series Controller
Configure Service Options
Configuring User Options
Creating Cartridges
Updating Device Firmware
Running the Collect Script
Configuring the DX-Series System
Quantum DX-Series System Unpacking and Installation Instructions
If you have already established a HyperTerminal
connection with the controller before powering on the
controller (see
Connecting to the DX-Series
the following text will display:
• Checking FC Switch Configuration
• Checking Power Sequencer Configuration
• Setting Sequencer Configuration
• Configuration Updated, Rebooting
• Checking FC Switch Configuration
• Checking Power Sequencer Configuration
(Recommended)
Document 6513502-06 A01
October 2006
0
Controller),
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dx30Dx series

Table of Contents